Village of Lakewood - Ballard Road Water Main Extension REBID

The Project includes the following Work: Installation of approximately 4,545 lineal feet of 12-inch water main installed by either opencut or horizontal directional drilling methods, including fire hydrants, valves in boxes, flushing station, sampling station, and dry well structure; including parkway and pavement restoration; and other miscellaneous items of work.
Plans (click to expand/collapse)
Name Size
Plans 5.9 MB